Equipment Skids & Enclosures
Pre-assembled, factory-tested, and ready to set down on site.
Skid-mounted equipment packages and enclosures, assembled and factory-tested before they ever leave the shop — so site work is placement and connection, not first-time assembly.
Assembling equipment for the first time on-site is where schedules slip — a missing bracket becomes a two-day wait, a fit-up issue becomes field rework. Skid-mounted packages and enclosures built and tested in our shop mean site work is placement and connection, not first-time assembly.
What we handle
Skid-mounted equipment packages built to a general arrangement drawing, with every interface — piping, electrical, structural — coordinated before fabrication starts. Custom enclosures sized and rated for the equipment and environment they're protecting.
How we work
Every skid or enclosure runs through a factory acceptance test before it ships, with the FAT protocol and results handed over alongside as-built documentation — so what arrives on site matches what was tested, not what was drawn.
Technical Deliverables
- ▸GA drawings
- ▸Bill of materials
- ▸Factory acceptance test (FAT) protocol
- ▸As-built documentation