Mechanical Installation & Commissioning
Alignment and installation done right the first time.
On-site mechanical installation and commissioning — equipment set, aligned, and verified against the drawing set before it's handed to electrical and controls to bring live.
Misaligned equipment doesn't fail immediately — it fails months later, as accelerated wear, vibration, or a bearing that runs hot. Getting alignment right at installation is cheaper than any fix after commissioning.
What we handle
Equipment set and aligned against the as-designed layout, with rigging and lifting planned before anything moves. Coordination with electrical and controls teams so mechanical handoff happens on a schedule they can actually build on, not a surprise.
How we work
Every installation closes against a documented punch list before it's called done, with an alignment and leveling report on file — not a verbal "it's good" from whoever was on site that day.
Technical Deliverables
- ▸Site erection plan & rigging/lift plan
- ▸Alignment & leveling report
- ▸Punch-list closure record
- ▸As-built mechanical drawing set
Ready to scope this against your line? An engineer reviews every request personally.
Scope This With an Engineer →